Here is a news upadate for Tellings Golden Miller and its subsidiary companies. Tellings Golden Miller has sold its depots at Fulwell, Dartford, Hounslow and Brixton to Capital Logistics who will take on the routes and buses.
London Central (Camberwell)
London Central have been successful in winning the contract for Route 197. New Streetdecks have been ordered for this win. London Central has also lost the contracts for routes 68, 468, N68, P5 and X68 to Capital Citybus from Summer 2015.
London General (Sutton)
London General have been successful in winning the contracts for Routes 412, 627, 663, 689, S1, S3 and S4. New Streetdecks and Streetlites have been ordered for these wins.
Tellings Golden Miller (Byfleet and Guildford)
We have lost routes 441 and 515 to BerksBus and SurreyBus.
Orpington Buses (Orpington)
Orpington Buses have been successful in winning the contracts for Routes 51, 132, 161, 229, 320, 359, 401, 402, 433, 464, 477, 486, 492, B11, B16, R1, R2, R3, R4, R5, R6, R7, R8, R9, R10, R11 and R12. New Streetdecks, Volvo Geminis, Metrocity EVs and Solo EVs have been ordered.
So, a successful past few weeks. More news and info soon!
Monday, 8 December 2014
New TfL tenders
Tranche 27
Route 33
Hope Buses
Hope Buses
18
20
New diesel single deckers
New contract begins on the 22nd of August 2015
Route 81
Hope Buses
Capital Logistics
14
15
New diesel double deckers
New contract begins on the 22nd of August 2015
Route 90
Hope Buses
Hope Buses
15
16
Existing diesel double deckers
New contract begins on the 22nd of August 2015
Route 120
Hope Buses
Hope Buses
18
20
Existing diesel double deckers
New contract begins on the 22nd of August 2015
Route 237
Metroline
Capital Logistics
20
22
New battery hybrid double deckers
New contract begins on the 22nd of August 2015
Route 350
Abellio London
Capital Logistics
8
9
New diesel double deckers
New contract begins on the 22nd of August 2015
Route 419
Hope Buses
Capital Logistics
6
8
New diesel single deckers
New contract begins on the 22nd of August 2015
Route 423
London United
Capital Logistics
7
8
New diesel single deckers
New contract begins on the 22nd of August 2015
Route 481
Capital Logistics
Hope Buses
2
4
Existing diesel single deckers
New contract begins on the 22nd of August 2015
Route 482
London United
Capital Logistics
9
11
New diesel double deckers
New contract begins on the 22nd of August 2015
Route 613
London United
Hope Buses
1
1
Existing diesel double decker
New contract begins on the 22nd of August 2015
Route 662
London United
thamesbus
1
1
Existing diesel double decker
New contract begins on the 22nd of August 2015
Route 665
London United
thamesbus
1
1
Existing diesel single decker
New contract begins on the 22nd of August 2015
Route 671
London United
thamesbus
1
1
Existing diesel double decker
New contract begins on the 22nd of August 2015
Route 691
London United
thamesbus
1
1
Existing diesel double decker
New contract begins on the 22nd of August 2015
Tranche 28
Route 51
Hope Buses
Orpington Buses
18
20
New flywheel hybrid double deckers
New contract begins on the 22nd of August 2015
Route 61
Hope Buses
Chancellors Travel
10
12
New battery hybrid double deckers
New contract begins on the 22nd of August 2015
Route 96
Route 33
Hope Buses
Hope Buses
18
20
New diesel single deckers
New contract begins on the 22nd of August 2015
Route 81
Hope Buses
Capital Logistics
14
15
New diesel double deckers
New contract begins on the 22nd of August 2015
Route 90
Hope Buses
Hope Buses
15
16
Existing diesel double deckers
New contract begins on the 22nd of August 2015
Route 120
Hope Buses
Hope Buses
18
20
Existing diesel double deckers
New contract begins on the 22nd of August 2015
Route 237
Metroline
Capital Logistics
20
22
New battery hybrid double deckers
New contract begins on the 22nd of August 2015
Route 350
Abellio London
Capital Logistics
8
9
New diesel double deckers
New contract begins on the 22nd of August 2015
Route 419
Hope Buses
Capital Logistics
6
8
New diesel single deckers
New contract begins on the 22nd of August 2015
Route 423
London United
Capital Logistics
7
8
New diesel single deckers
New contract begins on the 22nd of August 2015
Route 481
Capital Logistics
Hope Buses
2
4
Existing diesel single deckers
New contract begins on the 22nd of August 2015
Route 482
London United
Capital Logistics
9
11
New diesel double deckers
New contract begins on the 22nd of August 2015
Route 613
London United
Hope Buses
1
1
Existing diesel double decker
New contract begins on the 22nd of August 2015
Route 662
London United
thamesbus
1
1
Existing diesel double decker
New contract begins on the 22nd of August 2015
Route 665
London United
thamesbus
1
1
Existing diesel single decker
New contract begins on the 22nd of August 2015
Route 671
London United
thamesbus
1
1
Existing diesel double decker
New contract begins on the 22nd of August 2015
Route 691
London United
thamesbus
1
1
Existing diesel double decker
New contract begins on the 22nd of August 2015
Tranche 28
Route 51
Hope Buses
Orpington Buses
18
20
New flywheel hybrid double deckers
New contract begins on the 22nd of August 2015
Route 61
Hope Buses
Chancellors Travel
10
12
New battery hybrid double deckers
New contract begins on the 22nd of August 2015
Route 96
Hope Buses
Hope Buses
20
22
New battery hybrid double deckers
New contract begins on the 22nd of August 2015
Route 132
Hope Buses
Orpington Buses
12
14
New flywheel hybrid double deckers
New contract begins on the 22nd of August 2015
Route 132
Hope Buses
Orpington Buses
12
14
New flywheel hybrid double deckers
New contract begins on the 22nd of August 2015
Route 161
Metrobus
Orpington Buses
16
18
New battery hybrid double deckers
New contract begins on the 22nd of August 2015
Route 208
Hope Buses
Hope Buses
15
17
Existing diesel single deckers
New contract begins on the 22nd of August 2015
Route 227
Hope Buses
Hope Buses
12
14
New virtual electric single deckers
New contract begins on the 22nd of August 2015
Route 229
Hope Buses
Orpington Buses
19
22
New flywheel hybrid double deckers
New contract begins on the 22nd of August 2015
Route 246
Route 229
Hope Buses
Orpington Buses
19
22
New flywheel hybrid double deckers
New contract begins on the 22nd of August 2015
Route 246
Hope Buses
County Bus
5
6
New diesel single deckers
New contract begins on the 22nd of August 2015
Route 261
Hope Buses
Hope Buses
12
14
Existing diesel double deckers
New contract begins on the 22nd of August 2015
Route 269
Hope Buses
Capital Logistics
14
16
New battery hybrid double deckers
New contract begins on the 22nd of August 2015
Route 314
Hope Buses
Chancellors Travel
13
18
New virtual electric single deckers
New contract begins on the 22nd of August 2015
Route 320
Metrobus
Orpington Buses
12
14
New flywheel hybrid double deckers
New contract begins on the 22nd of August 2015
Route 320
Metrobus
Orpington Buses
12
14
New flywheel hybrid double deckers
New contract begins on the 22nd of August 2015
Route 352
Metrobus
Chancellors Travel
8
10
New diesel single deckers
New contract begins on the 22nd of August 2015
Route 353
Metrobus
Chancellors Travel
9
14
New flywheel hybrid double deckers
New contract includes extension to Croydon via Forestdale, Coombe Lane and Park Hill
New contract begins on the 22nd of August 2015
Route 354
Stagecoach London
Chancellors Travel
6
7
New diesel single deckers
New contract includes introduction of a Sunday service
New contract begins on the 22nd of August 2015
Route 356
Stagecoach London
Capital Logistics
6
8
New diesel single deckers
New contract begins on the 22nd of August 2015
Route 358
Metrobus
Hope Buses
15
22
New virtual electric single deckers
New contract begins on the 22nd of August 2015
Route 359
Capital Citybus
Orpington Buses
1
5
New diesel single deckers
New contract includes extension to Purley via Sanderstead and Riddlesdown
New contract begins on the 22nd of August 2015
Route 401
Hope Buses
Orpington Buses
8
10
New flywheel hybrid double deckers
New contract begins on the 22nd of August 2015
Route 402
*
Orpington Buses
*
6
New electric single deckers
New route between Bromley and Sevenoaks via Farnborough, Polhill and Riverhead
New contract begins on the 22nd of August 2015
Route 433 (formerly T33)
Connex
Orpington Buses
10
12
New diesel double deckers
New contract will see extension of route to New Addington via T32 route.
Route 464
Metrobus
Orpington Buses
3
4
New diesel single deckers
New contract begins on the 22nd of August 2015
Route 477
*
Orpington Buses
*
6
New electric single deckers
New route between Orpington and Bluewater via Crockenhill, Swanley and Dartford
New contract begins on the 22nd of August 2015
Route 486
Hope Buses
Orpington Buses
16
19
New flywheel hybrid double deckers
New contract includes extension to Dartford via Crayford
New contract begins on the 22nd of August 2015
Route 492
Capital Logistics
Orpington Buses
6
9
New flywheel hybrid double deckers
New contract begins on the 22nd of August 2015
Route 636
Hope Buses
Chancellors Travel
1
1
New diesel double deckers
New contract begins on the 22nd of August 2015
Route 638
Hope Buses
Chancellors Travel
1
1
New diesel double deckers
New contract begins on the 22nd of August 2015
Route 654
Chancellors Travel
Chancellors Travel
1
1
Existing diesel double deckers
New contract begins on the 22nd of August 2015
Route 664
Chancellors Travel
Chancellors Travel
2
2
Existing diesel double decker and single decker
New contract begins on the 22nd of August 2015
Route B11
Hope Buses
Orpington Buses
7
8
New electric single deckers
New contract begins on the 22nd of August 2015
Route B12
Capital Logistics
Hope Buses
6
7
New and existing diesel single deckers
New contract begins on the 22nd of August 2015
Route B13
Capital Logistics
Hope Buses
6
7
New and existing diesel single deckers
New contract begins on the 22nd of August 2015
Route B14
Metrobus
Hope Buses
5
6
New diesel single deckers
New contract begins on the 22nd of August 2015
Route B15
Capital Logistics
Hope Buses
6
7
New and existing diesel single deckers
New contract begins on the 22nd of August 2015
Route B16
Hope Buses
Orpington Buses
9
11
New electric single deckers
Route R1
Metrobus
Orpington Buses
7
8
New electric single deckers
New contract begins on the 22nd of August 2015
Route R2
Metrobus
Orpington Buses
4
5
New electric single deckers
New contract begins on the 22nd of August 2015
Route R3
Metrobus
Orpington Buses
4
5
New electric single deckers
New contract begins on the 22nd of August 2015
Route R4
Metrobus
Orpington Buses
6
7
New electric single deckers
New contract begins on the 22nd of August 2015
Route R5
Hope Buses
Orpington Buses
1
2
New electric single deckers
New contract begins on the 22nd of August 2015
Route R6
Metrobus
Orpington Buses
2
3
New electric single deckers
New contract begins on the 22nd of August 2015
Route R7
Hope Buses
Orpington Buses
1
2
New electric single deckers
New contract begins on the 22nd of August 2015
Route R8
Metrobus
Orpington Buses
1
2
New electric single deckers
New contract begins on the 22nd of August 2015
Route R9
Metrobus
Orpington Buses
3
4
New electric single deckers
New contract begins on the 22nd of August 2015
Route R10
Hope Buses
Orpington Buses
1
1
New electric single deckers
New contract begins on the 22nd of August 2015
Route R11
Metrobus
Orpington Buses
7
8
New electric single deckers
New contract begins on the 22nd of August 2015
Route R12
*
Orpington Buses
*
10
New electric single deckers
New route between Biggin Hill and Bexleyheath via Downe, Green Street Green, Orpington, St Mary Cray, Foots Cray, North Cray and Bexley Village
New contract begins on the 22nd of August 2015
Tranche 29
Route SL1
*
Hope Buses
*
12
New diesel single deckers
New circular station-link route from Paddington via Marylebone, Euston, St Pancras, King's Cross, Liverpool Street, London Bridge, Waterloo and Victoria.
New contract begins on the 22nd of August 2015
Route 358
Metrobus
Hope Buses
15
22
New virtual electric single deckers
New contract begins on the 22nd of August 2015
Route 359
Capital Citybus
Orpington Buses
1
5
New diesel single deckers
New contract includes extension to Purley via Sanderstead and Riddlesdown
New contract begins on the 22nd of August 2015
Route 401
Hope Buses
Orpington Buses
8
10
New flywheel hybrid double deckers
New contract begins on the 22nd of August 2015
Route 402
*
Orpington Buses
*
6
New electric single deckers
New route between Bromley and Sevenoaks via Farnborough, Polhill and Riverhead
New contract begins on the 22nd of August 2015
Route 433 (formerly T33)
Connex
Orpington Buses
10
12
New diesel double deckers
New contract will see extension of route to New Addington via T32 route.
Route 464
Metrobus
Orpington Buses
3
4
New diesel single deckers
New contract begins on the 22nd of August 2015
Route 477
*
Orpington Buses
*
6
New electric single deckers
New route between Orpington and Bluewater via Crockenhill, Swanley and Dartford
New contract begins on the 22nd of August 2015
Route 486
Hope Buses
Orpington Buses
16
19
New flywheel hybrid double deckers
New contract includes extension to Dartford via Crayford
New contract begins on the 22nd of August 2015
Route 492
Capital Logistics
Orpington Buses
6
9
New flywheel hybrid double deckers
New contract begins on the 22nd of August 2015
Route 636
Hope Buses
Chancellors Travel
1
1
New diesel double deckers
New contract begins on the 22nd of August 2015
Route 638
Hope Buses
Chancellors Travel
1
1
New diesel double deckers
New contract begins on the 22nd of August 2015
Route 654
Chancellors Travel
Chancellors Travel
1
1
Existing diesel double deckers
New contract begins on the 22nd of August 2015
Route 664
Chancellors Travel
Chancellors Travel
2
2
Existing diesel double decker and single decker
New contract begins on the 22nd of August 2015
Route B11
Hope Buses
Orpington Buses
7
8
New electric single deckers
New contract begins on the 22nd of August 2015
Route B12
Capital Logistics
Hope Buses
6
7
New and existing diesel single deckers
New contract begins on the 22nd of August 2015
Route B13
Capital Logistics
Hope Buses
6
7
New and existing diesel single deckers
New contract begins on the 22nd of August 2015
Route B14
Metrobus
Hope Buses
5
6
New diesel single deckers
New contract begins on the 22nd of August 2015
Route B15
Capital Logistics
Hope Buses
6
7
New and existing diesel single deckers
New contract begins on the 22nd of August 2015
Route B16
Hope Buses
Orpington Buses
9
11
New electric single deckers
Route R1
Metrobus
Orpington Buses
7
8
New electric single deckers
New contract begins on the 22nd of August 2015
Route R2
Metrobus
Orpington Buses
4
5
New electric single deckers
New contract begins on the 22nd of August 2015
Route R3
Metrobus
Orpington Buses
4
5
New electric single deckers
New contract begins on the 22nd of August 2015
Route R4
Metrobus
Orpington Buses
6
7
New electric single deckers
New contract begins on the 22nd of August 2015
Route R5
Hope Buses
Orpington Buses
1
2
New electric single deckers
New contract begins on the 22nd of August 2015
Route R6
Metrobus
Orpington Buses
2
3
New electric single deckers
New contract begins on the 22nd of August 2015
Route R7
Hope Buses
Orpington Buses
1
2
New electric single deckers
New contract begins on the 22nd of August 2015
Route R8
Metrobus
Orpington Buses
1
2
New electric single deckers
New contract begins on the 22nd of August 2015
Route R9
Metrobus
Orpington Buses
3
4
New electric single deckers
New contract begins on the 22nd of August 2015
Route R10
Hope Buses
Orpington Buses
1
1
New electric single deckers
New contract begins on the 22nd of August 2015
Route R11
Metrobus
Orpington Buses
7
8
New electric single deckers
New contract begins on the 22nd of August 2015
Route R12
*
Orpington Buses
*
10
New electric single deckers
New route between Biggin Hill and Bexleyheath via Downe, Green Street Green, Orpington, St Mary Cray, Foots Cray, North Cray and Bexley Village
New contract begins on the 22nd of August 2015
Tranche 29
Route SL1
*
Hope Buses
*
12
New diesel single deckers
New circular station-link route from Paddington via Marylebone, Euston, St Pancras, King's Cross, Liverpool Street, London Bridge, Waterloo and Victoria.
New contract begins on the 22nd of August 2015
Friday, 5 December 2014
Capital Logistics orders new buses
Capital Logistics is to invest £10 million in new buses, refurbishing existing buses, upgrading depot facilities, and upgrading the Horsham travel shop. Around £5 million will be spent on new buses, to upgrade the fleet, and allow the entire fleet to be wheelchair accessible.
The order will include:
14 Mercedes-Benz Citaro's for Route 4
15 Enviro 200's for Route 10, 30, 50 and 70.
10 Enviro 400's for Route 1.
This bus order will displace Volvo Olympians 3-10, Dennis Darts 11-13 and Enviro 200's 41-53 for withdrawal.
All vehicles ordered will include free wifi, high-backed part leather seating, power sockets, audio-visual next stop announcements, and easy to see white LED destination displays.
Several vehicles in the fleet will be completely refurbished including Citaro's 54-58 and Enviro 400's 59-60 which will be refurbished to the same spec the new vehicles will carry. Compasses 24-26 and Nimbuses 27-38 will recieve a refresh, with a repaint, new seat cushions, free wifi and audio-visual announcements which will also be fitted to the entire fleet.
Horsham depot will also be completely rebuilt, with additional capacity, and high tech engineering facilities.
Horsham travel shop will be completely refurbished, and include free wifi, comfortable seating, and a easier layout.
We look forward to introducing our new buses, which will enter service in Fenuary 2015, and the Horsham travel shop will shut on the 20th of December and will be refurbished during the Christmas 2014 period, and reopen on the 5th of January. Horsham depot will be completely rebuilt beg inning in Janaury 2015 and running through until August 2015. We look forward to welcoming you aboard!
Capital Logistics has also purchased the Brixton, Dartford, Fulwell, and Hounslow depots of Tellings Golden Miller. Byfleet, Latimer Road, Camberwell and Guildford will remain with Tellings Golden Miller. The routes won by Tellings Golden Miller, will transfer to Capital Logistics, and all depots except Dartford will close. More info on which depot the routes will operate from soon
Capital Logistics has also purchased the Brixton, Dartford, Fulwell, and Hounslow depots of Tellings Golden Miller. Byfleet, Latimer Road, Camberwell and Guildford will remain with Tellings Golden Miller. The routes won by Tellings Golden Miller, will transfer to Capital Logistics, and all depots except Dartford will close. More info on which depot the routes will operate from soon
Monday, 1 December 2014
An introduction to Capital Logistics
Capital Logistics is a bus company based in Horsham, Sussex established in 1990. Running a large commercial network around Sussex, Surrey and Hampshire, we provide quality local bus services centered on the areas of Horsham, Chichester, Guildford and Staines. We currently have depots at Horsham (HM), Heathrow (HR) and Croydon (CD), and a outstation at Chichester (CE). All of our routes are currently deregulated commercial routes, however, between 1997 and 1999 we did operate three London routes, the 60, 726 and U3. We may bid for TfL contracts in the future however. Our fleet is mostly low floor single deckers, with some low floor and step entrance double deckers. All of our fleet is in either our white and maroon livery used between 1990 and 2010, or our white and grey livery used since 2011. Below is the logos we have used in our history:
Above is the logo we used between 1990 and 2010
Above is the logo we have used since 2011
Below is the list of routes we run.
1 Horsham to Crawley. Run from HM
2 Horsham to Guildford. Run from HM
3 Horsham to Worthing. Run from HM
4 Horsham to Portsmouth. Run from CE
5 Horsham to Petersfield. Run from HM
10 Horsham to Dorking. Run from HM
20 Horsham to Billingshurst. Run from HM
25 Horsham to Brighton. Run from HM
30 Midhurst to Guildford. Run from CE
33 Staines to High Wycombe. Run from HR
35 Staines to Reading. Run from HR
36 Staines to Heathrow. Run from HR
45 Horsham to Partridge Green. Run from HM
46 Horsham to Haywards Heath. Run from HM
50 Caterham to Crawley. Run from CD
70 Croydon to Crawley. Run from CD
Below is the list of buses in our fleet:
3 N101GVA - 10.1 metre Volvo Olympian with Royale bodywork - currently in the fleet
4 N102GVB - 10.1 metre Volvo Olympian with Royale bodywork - currently in the fleet
5 N103GVC - 10.1 metre Volvo Olympian with Royale bodywork - currently in the fleet
6 N104GVD - 10.1 metre Volvo Olympian with Royale bodywork - currently in the fleet
7 N105GVE - 10.1 metre Volvo Olympian with Royale bodywork - currently in the fleet
8 N106GVF - 10.1 metre Volvo Olympian with Royale bodywork - currently in the fleet
9 N107GVG - 10.1 metre Volvo Olympian with Royale bodywork - currently in the fleet
10 N108GVH - 10.1 metre Volvo Olympian with Royale bodywork - currently in the fleet
11 R301LME - 10.1 metre Dennis Dart with Pointer bodywork - currently in the fleet
12 R302LMF - 10.1 metre Dennis Dart with Pointer bodywork - currently in the fleet
13 T101LMG - 10.1 metre Dennis Dart with Pointer bodywork - currently in the fleet
14 T102LMH - 10.1 metre DAF DB250 with Spectra bodywork - currently in the fleet
15 T103LMJ - 10.1 metre DAF DB250 with President bodywork - currently in the fleet
16 V101LNA - 10.1 metre Dennis Dart with Pointer bodywork - currently in the fleet
17 V102LNB - 10.1 metre Dennis Dart with Pointer bodywork - currently in the fleet
18 V103LNC - 10.1 metre Dennis Dart with Pointer bodywork - currently in the fleet
19 V104LND - 10.1 metre Dennis Dart with Pointer bodywork - currently in the fleet
20 W105LNE - 8.8 metre Dennis Dart with ALX200 bodywork - currently in the fleet
21 X516GHA - 8.8 metre Dennis Dart with Pointer bodywork - currently in the fleet
22 X517GHB - 8.8 metre Dennis Dart with Pointer bodywork - currently in the fleet
23 X518GHC - 11.3 metre Dennis Dart with Pointer bodywork - currently in the fleet
24 X519GHD - 10.7 metre Dennis Dart with Compass bodywork - currently in the fleet
25 X520GHE - 10.7 metre Dennis Dart with Compass bodywork - currently in the fleet
26 X521GHF - 10.7 metre Dennis Dart with Compass bodywork - currently in the fleet
27 GX51GHG - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
28 GX51GHH - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
29 GX51GHJ - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
30 GX51GHK - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
31 GX51GHL - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
32 GX51GHM - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
33 GX51GHN - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
34 GX51GHO - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
35 GX51GHP - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
36 GX02GHR - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
37 GX52GHS - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
38 GX53GHT - 8.8 metre Dennis Dart with Pointer bodywork - currently in the fleet
39 GX54GHU - 8.8 metre Dennis Dart with Pointer bodywork - currently in the fleet
40 GX05GVJ - 10.1 metre Volvo B7TL with ALX400 bodywork - currently in the fleet
41 GX56GJA - 10.7 metre Enviro 200 - currently in the fleet
42 GX56GJB - 10.7 metre Enviro 200 - currently in the fleet
43 GX56GJC - 10.7 metre Enviro 200 - currently in the fleet
44 GX56GJD - 10.7 metre Enviro 200 - currently in the fleet
45 GX56GJE - 10.7 metre Enviro 200 - currently in the fleet
46 GX56GJF - 10.7 metre Enviro 200 - currently in the fleet
47 GX56GJG - 10.7 metre Enviro 200 - currently in the fleet
48 GX56GJH - 10.7 metre Enviro 200 - currently in the fleet
49 GX56GJJ - 10.7 metre Enviro 200 - currently in the fleet
50 GX56GJK - 10.7 metre Enviro 200 - currently in the fleet
51 GX56GJL - 10.7 metre Enviro 200 - currently in the fleet
52 GX56GJM - 10.7 metre Enviro 200 - currently in the fleet
53 GX56GJN - 10.7 metre Enviro 200 - currently in the fleet
54 BV57HTA - 12 metre Citaro - currently in the fleet
56 BV57HTB - 12 metre Citaro - currently in the fleet
57 BV57HTC - 12 metre Citaro - currently in the fleet
58 BV57HTD - 12 metre Citaro - currently in the fleet
59 GX59GVK - 10.1 metre Volvo B9TL with Enviro 400 bodywork - currently in the fleet
60 GX59GVL - 10.1 metre Enviro 400 - currently in the fleet
61 GX11GJO - 8.9 metre Enviro 200 - currently in the fleet
62 YX63LPY - 10.8 metre Enviro 200 - currently in the fleet
That is our company basically, we hope you enjoy it!
Above is the logo we used between 1990 and 2010
Above is the logo we have used since 2011
Below is the list of routes we run.
1 Horsham to Crawley. Run from HM
2 Horsham to Guildford. Run from HM
3 Horsham to Worthing. Run from HM
4 Horsham to Portsmouth. Run from CE
5 Horsham to Petersfield. Run from HM
10 Horsham to Dorking. Run from HM
20 Horsham to Billingshurst. Run from HM
25 Horsham to Brighton. Run from HM
30 Midhurst to Guildford. Run from CE
33 Staines to High Wycombe. Run from HR
35 Staines to Reading. Run from HR
36 Staines to Heathrow. Run from HR
45 Horsham to Partridge Green. Run from HM
46 Horsham to Haywards Heath. Run from HM
50 Caterham to Crawley. Run from CD
70 Croydon to Crawley. Run from CD
Below is the list of buses in our fleet:
3 N101GVA - 10.1 metre Volvo Olympian with Royale bodywork - currently in the fleet
4 N102GVB - 10.1 metre Volvo Olympian with Royale bodywork - currently in the fleet
5 N103GVC - 10.1 metre Volvo Olympian with Royale bodywork - currently in the fleet
6 N104GVD - 10.1 metre Volvo Olympian with Royale bodywork - currently in the fleet
7 N105GVE - 10.1 metre Volvo Olympian with Royale bodywork - currently in the fleet
8 N106GVF - 10.1 metre Volvo Olympian with Royale bodywork - currently in the fleet
9 N107GVG - 10.1 metre Volvo Olympian with Royale bodywork - currently in the fleet
10 N108GVH - 10.1 metre Volvo Olympian with Royale bodywork - currently in the fleet
11 R301LME - 10.1 metre Dennis Dart with Pointer bodywork - currently in the fleet
12 R302LMF - 10.1 metre Dennis Dart with Pointer bodywork - currently in the fleet
13 T101LMG - 10.1 metre Dennis Dart with Pointer bodywork - currently in the fleet
14 T102LMH - 10.1 metre DAF DB250 with Spectra bodywork - currently in the fleet
15 T103LMJ - 10.1 metre DAF DB250 with President bodywork - currently in the fleet
16 V101LNA - 10.1 metre Dennis Dart with Pointer bodywork - currently in the fleet
17 V102LNB - 10.1 metre Dennis Dart with Pointer bodywork - currently in the fleet
18 V103LNC - 10.1 metre Dennis Dart with Pointer bodywork - currently in the fleet
19 V104LND - 10.1 metre Dennis Dart with Pointer bodywork - currently in the fleet
20 W105LNE - 8.8 metre Dennis Dart with ALX200 bodywork - currently in the fleet
21 X516GHA - 8.8 metre Dennis Dart with Pointer bodywork - currently in the fleet
22 X517GHB - 8.8 metre Dennis Dart with Pointer bodywork - currently in the fleet
23 X518GHC - 11.3 metre Dennis Dart with Pointer bodywork - currently in the fleet
24 X519GHD - 10.7 metre Dennis Dart with Compass bodywork - currently in the fleet
25 X520GHE - 10.7 metre Dennis Dart with Compass bodywork - currently in the fleet
26 X521GHF - 10.7 metre Dennis Dart with Compass bodywork - currently in the fleet
27 GX51GHG - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
28 GX51GHH - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
29 GX51GHJ - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
30 GX51GHK - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
31 GX51GHL - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
32 GX51GHM - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
33 GX51GHN - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
34 GX51GHO - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
35 GX51GHP - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
36 GX02GHR - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
37 GX52GHS - 10.1 metre Dennis Dart with Nimbus bodywork - currently in the fleet
38 GX53GHT - 8.8 metre Dennis Dart with Pointer bodywork - currently in the fleet
39 GX54GHU - 8.8 metre Dennis Dart with Pointer bodywork - currently in the fleet
40 GX05GVJ - 10.1 metre Volvo B7TL with ALX400 bodywork - currently in the fleet
41 GX56GJA - 10.7 metre Enviro 200 - currently in the fleet
42 GX56GJB - 10.7 metre Enviro 200 - currently in the fleet
43 GX56GJC - 10.7 metre Enviro 200 - currently in the fleet
44 GX56GJD - 10.7 metre Enviro 200 - currently in the fleet
45 GX56GJE - 10.7 metre Enviro 200 - currently in the fleet
46 GX56GJF - 10.7 metre Enviro 200 - currently in the fleet
47 GX56GJG - 10.7 metre Enviro 200 - currently in the fleet
48 GX56GJH - 10.7 metre Enviro 200 - currently in the fleet
49 GX56GJJ - 10.7 metre Enviro 200 - currently in the fleet
50 GX56GJK - 10.7 metre Enviro 200 - currently in the fleet
51 GX56GJL - 10.7 metre Enviro 200 - currently in the fleet
52 GX56GJM - 10.7 metre Enviro 200 - currently in the fleet
53 GX56GJN - 10.7 metre Enviro 200 - currently in the fleet
54 BV57HTA - 12 metre Citaro - currently in the fleet
56 BV57HTB - 12 metre Citaro - currently in the fleet
57 BV57HTC - 12 metre Citaro - currently in the fleet
58 BV57HTD - 12 metre Citaro - currently in the fleet
59 GX59GVK - 10.1 metre Volvo B9TL with Enviro 400 bodywork - currently in the fleet
60 GX59GVL - 10.1 metre Enviro 400 - currently in the fleet
61 GX11GJO - 8.9 metre Enviro 200 - currently in the fleet
62 YX63LPY - 10.8 metre Enviro 200 - currently in the fleet
That is our company basically, we hope you enjoy it!
Friday, 28 November 2014
An introduction to Thames Bus
Thamesbus is a new small local bus operator, based in Byfleet, Surrey. We will run services around North West Surrey, South West London, Berkshire, Buckinghamshire and Oxfordshire. The company formerly existed between 2002 and 2003, however this new company is not connected to the original company.
The company will begin operations on the 16th of March 2015, with the launch of 2 new routes network around Surrey and Berkshire. Below is some details:
Route 12 - Addlestone to Guildford, via Ottershaw, Woking and Mayford. This route will use 1 new 8.9 metre Enviro 200.
Route 442 - Windsor Castle to Heathrow Central, via Datchet, Wraysbury and Staines. This route will use 3 second-hand 10.2 metre Enviro 200's.
Route 12 and Route 442 will run Monday to Saturday every hour.
Below is the vehicles currently in the fleet and on order:
DE1 LJ56ONR - Enviro 200 - currently in the fleet
DE2 LJ56ONS - Enviro 200 - currently in the fleet
DE3 LJ56ONT - Enviro 200 - currently in the fleet
DE4 YY15RCV - Enviro 200 - on order
We hope to expand, so look out for a thamesbus near you!
The company will begin operations on the 16th of March 2015, with the launch of 2 new routes network around Surrey and Berkshire. Below is some details:
Route 12 - Addlestone to Guildford, via Ottershaw, Woking and Mayford. This route will use 1 new 8.9 metre Enviro 200.
Route 442 - Windsor Castle to Heathrow Central, via Datchet, Wraysbury and Staines. This route will use 3 second-hand 10.2 metre Enviro 200's.
Route 12 and Route 442 will run Monday to Saturday every hour.
Below is the vehicles currently in the fleet and on order:
DE1 LJ56ONR - Enviro 200 - currently in the fleet
DE2 LJ56ONS - Enviro 200 - currently in the fleet
DE3 LJ56ONT - Enviro 200 - currently in the fleet
DE4 YY15RCV - Enviro 200 - on order
We hope to expand, so look out for a thamesbus near you!
Monday, 24 November 2014
An Introduction to County Bus
County Bus is a new local bus operator around Surrey and Kent, running from a depot in Godstone. The company is run by John Newton, the former operations director and co-owner at Capital Transport Services. The company was established in October 2014 and in January 2015, will launch its first new route, the 517, between Sevenoaks and Reigate, running via the towns of Riverhead, Westerham, Oxted, Godstone, Nutfield and Redhill. The route will run every hour, Monday to Saturday using 3 new 8.9 metre Alexander Dennis Enviro 200 midibuses, which will be delivered in December 2014. A school element, the S17, will also be launched in January 2015. The route will run between Sevenoaks and East Surrey College in Redhill. The route will use 2 Dennis Trident's. We also will be launching a second new route, the 145, between Sevenoaks and Crawley. The route will be launched on the 2nd of February 2015, running via the towns of Edenbridge, Lingfield, Blindley Heath and Horley. The route will also serve Gatwick Airport. The route will run every hour, Monday to Saturday using 4 new 10.8 metre Alexander Dennis Enviro 200 midibuses, which will be delivered in January 2015. We also have won the contracts for Transport for London routes 403, 405, 407, 434 and 466. The contracts will begin on the 29th of August 2015 and use brand new hybrid vehicles. Below is a fleet-list of the companys current fleet of vehicles, as well as ones on order.
Single deckers
DP1 - KM02HFL - 10.1 metre Dennis Dart with Pointer bodywork - currently in the fleet
ELE1 - PE56UFP - 9.4 metre Enviro 200 with Esteem bodywork - currently in the fleet
DE1 - MX57CCO - 11.8 metre Enviro 300 - currently in the fleet
DE2 - YY64AAA - 8.9 metre Enviro 200 - on order
DE3 - YY64AAB - 8.9 metre Enviro 200 - on order
DE4 - YY64AAC - 8.9 metre Enviro 200 - on order
DE5 - YY64AAD - 10.8 metre Enviro 200 - on order
DE6 - YY64AAE - 10.8 metre Enviro 200 - on order
DE7 - YY64AAF - 10.8 metre Enviro 200 - on order
DE8 - YY64AAG - 10.8 metre Enviro 200 - on order
DE9 - YY15AAH - 8.9 metre Enviro 200 - on order
DE10 - YY15AAJ - 8.9 metre Enviro 200 - on order
DE11 - YY15AAK - 8.9 metre Enviro 200 - on order
DE12 - YY15AAL - 8.9 metre Enviro 200 - on order
DE13 - YY15AAM - 8.9 metre Enviro 200 - on order
DE14 - YY15AAN - 8.9 metre Enviro 200 - on order
DE15 - YY15AAO - 8.9 metre Enviro 200 - on order
Double deckers
Single deckers
DP1 - KM02HFL - 10.1 metre Dennis Dart with Pointer bodywork - currently in the fleet
ELE1 - PE56UFP - 9.4 metre Enviro 200 with Esteem bodywork - currently in the fleet
DE1 - MX57CCO - 11.8 metre Enviro 300 - currently in the fleet
DE2 - YY64AAA - 8.9 metre Enviro 200 - on order
DE3 - YY64AAB - 8.9 metre Enviro 200 - on order
DE4 - YY64AAC - 8.9 metre Enviro 200 - on order
DE5 - YY64AAD - 10.8 metre Enviro 200 - on order
DE6 - YY64AAE - 10.8 metre Enviro 200 - on order
DE7 - YY64AAF - 10.8 metre Enviro 200 - on order
DE8 - YY64AAG - 10.8 metre Enviro 200 - on order
DE9 - YY15AAH - 8.9 metre Enviro 200 - on order
DE10 - YY15AAJ - 8.9 metre Enviro 200 - on order
DE11 - YY15AAK - 8.9 metre Enviro 200 - on order
DE12 - YY15AAL - 8.9 metre Enviro 200 - on order
DE13 - YY15AAM - 8.9 metre Enviro 200 - on order
DE14 - YY15AAN - 8.9 metre Enviro 200 - on order
DE15 - YY15AAO - 8.9 metre Enviro 200 - on order
Double deckers
TA1 - KN52NDL - 9.9 metre Dennis Trident 2 with ALX400 bodywork - currently in the fleet
TA2 - SN03EAM - 9.9 metre Dennis Trident 2 with ALX400 bodywork - currently in the fleet
TA3 - SN03EAW - 9.9 metre Dennis Trident 2 with ALX400 bodywork - currently in the fleet
TA4 - LX04FXW - 10.5 metre Dennis Trident 2 with ALX400 bodywork - currently in the fleet
TP1 - LK03GFV - 9.9 metre Dennis Trident 2 with President bodywork - currently in the fleet
DED1 - VT59JPT - 10.8 metre Enviro 400 - currently in the fleet
DED2 - YX60DWL - 10.8 metre Enviro 400 - currently in the fleet
DEH1 - SL15AAA - 10.3 metre Enviro 400H - on order
DEH2 - SL15AAB - 10.3 metre Enviro 400H - on order
DEH3 - SL15AAC - 10.3 metre Enviro 400H - on order
DEH4 - SL15AAD - 10.3 metre Enviro 400H - on order
DEH5 - SL15AAE - 10.3 metre Enviro 400H - on order
DEH6 - SL15AAF - 10.3 metre Enviro 400H - on order
DEH7 - SL15AAG - 10.3 metre Enviro 400H - on order
DEH8 - SL15AAH - 10.3 metre Enviro 400H - on order
DEH9 - SL15AAJ - 10.3 metre Enviro 400H - on order
DEH10 - SL15AAK - 10.3 metre Enviro 400H - on order
DEH11 - SL15AAL - 10.3 metre Enviro 400H - on order
DEH12 - SL15AAM - 10.3 metre Enviro 400H - on order
DEH13 - SL15AAN - 10.3 metre Enviro 400H - on order
DEH14 - SL15AAO - 10.3 metre Enviro 400H - on order
DEH15 - SL15AAP - 10.3 metre Enviro 400H - on order
DEH16 - SL15AAR - 10.3 metre Enviro 400H - on order
DEH17 - SL15AAS - 10.3 metre Enviro 400H - on order
DEH18 - SL15AAT - 10.3 metre Enviro 400H - on order
DEH19 - SL15AAU - 10.3 metre Enviro 400H - on order
DEH20 - SK15AAV - 10.3 metre Enviro 400H - on order
DEH21 - SK15AAW - 10.3 metre Enviro 400H - on order
DEH22 - SK15AAX - 10.3 metre Enviro 400H - on order
DEH23 - SK15AAY - 10.3 metre Enviro 400H - on order
DEH24 - SK15AAZ - 10.3 metre Enviro 400H - on order
DEH25 - SK15ABA - 10.3 metre Enviro 400H - on order
DEH26 - SK15ABB - 10.3 metre Enviro 400H - on order
DEH27 - SK15ABC - 10.3 metre Enviro 400H - on order
DEH28 - SK15ABD - 10.3 metre Enviro 400H - on order
DEH29 - SK15ABE - 10.3 metre Enviro 400H - on order
DEH30 - SK15ABF - 10.3 metre Enviro 400H - on order
DEH31 - SK15ABG - 10.3 metre Enviro 400H - on order
DEH32 - SK15ABH - 10.3 metre Enviro 400H - on order
DEH33 - SK15ABJ - 10.3 metre Enviro 400H - on order
DEH34 - SK15ABK - 10.3 metre Enviro 400H - on order
DEH35 - SK15ABL - 10.3 metre Enviro 400H - on order
DEH36 - SK15ABM - 10.3 metre Enviro 400H - on order
DEH37 - SK15ABN - 10.3 metre Enviro 400H - on order
DEH38 - SK15ABO - 10.3 metre Enviro 400H - on order
DEH39 - SK15ABP - 10.3 metre Enviro 400H - on order
DEH40 - SK15ABR - 10.3 metre Enviro 400H - on order
DEH41 - SK15ABS - 10.3 metre Enviro 400H - on order
DEH42 - SK15ABT - 10.3 metre Enviro 400H - on order
DEH43 - SK15ABU - 10.3 metre Enviro 400H - on order
DEH44 - SK15ABV - 10.3 metre Enviro 400H - on order
DEH45 - SK15ABW - 10.3 metre Enviro 400H - on order
DEH46 - SK15ABX - 10.3 metre Enviro 400H - on order
DEH47 - SK15ABY - 10.3 metre Enviro 400H - on order
DEH48 - SK15ABZ - 10.3 metre Enviro 400H - on order
DEH49 - SN15ACA - 10.3 metre Enviro 400H - on order
DEH50 - SN15ACB - 10.3 metre Enviro 400H - on order
DEH51 - SN15ACC - 10.3 metre Enviro 400H - on order
DEH52 - SN15ACD - 10.3 metre Enviro 400H - on order
DEH53 - SN15ACE - 10.3 metre Enviro 400H - on order
DEH54 - SN15ACF - 10.3 metre Enviro 400H - on order
DEH55 - SN15ACG - 10.3 metre Enviro 400H - on order
DEH56 - SN15ACH - 10.3 metre Enviro 400H - on order
DEH57 - SN15ACJ- 10.3 metre Enviro 400H - on order
DEH58 - SN15ACL - 10.3 metre Enviro 400H - on order
DEH59 - SN15ACM - 10.3 metre Enviro 400H - on order
DEH60 - SN15ACN - 10.3 metre Enviro 400H - on order
All vehicles marked currently in the fleet have the livery and interior of the previous owners, however, the vehicles that are marked with currently in the fleet will be subjected to a £250,000 investment in a major refurbishment programme. CountyBus has big plans for expansion in Surrey and Kent, so watch out for a green and white CountyBus vehicle coming down your road!
TA2 - SN03EAM - 9.9 metre Dennis Trident 2 with ALX400 bodywork - currently in the fleet
TA3 - SN03EAW - 9.9 metre Dennis Trident 2 with ALX400 bodywork - currently in the fleet
TA4 - LX04FXW - 10.5 metre Dennis Trident 2 with ALX400 bodywork - currently in the fleet
TP1 - LK03GFV - 9.9 metre Dennis Trident 2 with President bodywork - currently in the fleet
DED1 - VT59JPT - 10.8 metre Enviro 400 - currently in the fleet
DED2 - YX60DWL - 10.8 metre Enviro 400 - currently in the fleet
DEH1 - SL15AAA - 10.3 metre Enviro 400H - on order
DEH2 - SL15AAB - 10.3 metre Enviro 400H - on order
DEH3 - SL15AAC - 10.3 metre Enviro 400H - on order
DEH4 - SL15AAD - 10.3 metre Enviro 400H - on order
DEH5 - SL15AAE - 10.3 metre Enviro 400H - on order
DEH6 - SL15AAF - 10.3 metre Enviro 400H - on order
DEH7 - SL15AAG - 10.3 metre Enviro 400H - on order
DEH8 - SL15AAH - 10.3 metre Enviro 400H - on order
DEH9 - SL15AAJ - 10.3 metre Enviro 400H - on order
DEH10 - SL15AAK - 10.3 metre Enviro 400H - on order
DEH11 - SL15AAL - 10.3 metre Enviro 400H - on order
DEH12 - SL15AAM - 10.3 metre Enviro 400H - on order
DEH13 - SL15AAN - 10.3 metre Enviro 400H - on order
DEH14 - SL15AAO - 10.3 metre Enviro 400H - on order
DEH15 - SL15AAP - 10.3 metre Enviro 400H - on order
DEH16 - SL15AAR - 10.3 metre Enviro 400H - on order
DEH17 - SL15AAS - 10.3 metre Enviro 400H - on order
DEH18 - SL15AAT - 10.3 metre Enviro 400H - on order
DEH19 - SL15AAU - 10.3 metre Enviro 400H - on order
DEH20 - SK15AAV - 10.3 metre Enviro 400H - on order
DEH21 - SK15AAW - 10.3 metre Enviro 400H - on order
DEH22 - SK15AAX - 10.3 metre Enviro 400H - on order
DEH23 - SK15AAY - 10.3 metre Enviro 400H - on order
DEH24 - SK15AAZ - 10.3 metre Enviro 400H - on order
DEH25 - SK15ABA - 10.3 metre Enviro 400H - on order
DEH26 - SK15ABB - 10.3 metre Enviro 400H - on order
DEH27 - SK15ABC - 10.3 metre Enviro 400H - on order
DEH28 - SK15ABD - 10.3 metre Enviro 400H - on order
DEH29 - SK15ABE - 10.3 metre Enviro 400H - on order
DEH30 - SK15ABF - 10.3 metre Enviro 400H - on order
DEH31 - SK15ABG - 10.3 metre Enviro 400H - on order
DEH32 - SK15ABH - 10.3 metre Enviro 400H - on order
DEH33 - SK15ABJ - 10.3 metre Enviro 400H - on order
DEH34 - SK15ABK - 10.3 metre Enviro 400H - on order
DEH35 - SK15ABL - 10.3 metre Enviro 400H - on order
DEH36 - SK15ABM - 10.3 metre Enviro 400H - on order
DEH37 - SK15ABN - 10.3 metre Enviro 400H - on order
DEH38 - SK15ABO - 10.3 metre Enviro 400H - on order
DEH39 - SK15ABP - 10.3 metre Enviro 400H - on order
DEH40 - SK15ABR - 10.3 metre Enviro 400H - on order
DEH41 - SK15ABS - 10.3 metre Enviro 400H - on order
DEH42 - SK15ABT - 10.3 metre Enviro 400H - on order
DEH43 - SK15ABU - 10.3 metre Enviro 400H - on order
DEH44 - SK15ABV - 10.3 metre Enviro 400H - on order
DEH45 - SK15ABW - 10.3 metre Enviro 400H - on order
DEH46 - SK15ABX - 10.3 metre Enviro 400H - on order
DEH47 - SK15ABY - 10.3 metre Enviro 400H - on order
DEH48 - SK15ABZ - 10.3 metre Enviro 400H - on order
DEH49 - SN15ACA - 10.3 metre Enviro 400H - on order
DEH50 - SN15ACB - 10.3 metre Enviro 400H - on order
DEH51 - SN15ACC - 10.3 metre Enviro 400H - on order
DEH52 - SN15ACD - 10.3 metre Enviro 400H - on order
DEH53 - SN15ACE - 10.3 metre Enviro 400H - on order
DEH54 - SN15ACF - 10.3 metre Enviro 400H - on order
DEH55 - SN15ACG - 10.3 metre Enviro 400H - on order
DEH56 - SN15ACH - 10.3 metre Enviro 400H - on order
DEH57 - SN15ACJ- 10.3 metre Enviro 400H - on order
DEH58 - SN15ACL - 10.3 metre Enviro 400H - on order
DEH59 - SN15ACM - 10.3 metre Enviro 400H - on order
DEH60 - SN15ACN - 10.3 metre Enviro 400H - on order
All vehicles marked currently in the fleet have the livery and interior of the previous owners, however, the vehicles that are marked with currently in the fleet will be subjected to a £250,000 investment in a major refurbishment programme. CountyBus has big plans for expansion in Surrey and Kent, so watch out for a green and white CountyBus vehicle coming down your road!
Saturday, 22 November 2014
Capital Transport Services wins TSGN, ICEC, ICWC, DLR and LO rail franchises!
Capital Transport Services is happy to announce thet we have won the contract to run the Intercity East Coast, Intercity West Coast, Thameslink,Southern, Great Northern and Gatwick Express, London Overground and Docklands Light Railway. Docklands Light Railway will be a 50/50 joint venture between Capital Transport Services and Tellings Golden Miller. The rest will be run entirely by Capital Transport Service wholly. All franchises begin on the 25th of January 2015. Below is our plans for the new franchises we have won:
Thameslink, Southern, Great Northern and Gatwick Express: Our plans
Free wifi on all trains.
Plug sockets on all trains.
Toilets on all trains.
New Bombardier Electrostar trains replacing the class 171, 313, 317, 319 321, 365, 442 and 455 trains.
Additonal services across the network.
Resignalling between London Victoria/Bridge and Brighton.
A new 'Metro' brand of services, frequencies of every at least every ten minute between London, Sutton and Epsom via West Croydon or Hackbridge.
Remodelling of Windmill Bridge junction.
New stations at Ampthill, Cambridge Parkway and Beddington.
Automatic train operation between London Bridge and St Pancras International.
Increased line speeds of up to 100 mph between Clapham Junction/New Cross Gate and Brighton.
4 trains per hour on the Cambridge to London express service
New services between London Charing Cross and Oxford, via the North Downs Line
25KV overhead electrification between Hurst Green and Uckfield, between Ore and Ashford International, and between in unelectrified gaps on the North Downs Line.
The premium for travelling at peak-times scrapped, with just one band of ticket available, charged at current super off peak rates.
Refurbished and improved stations, eg staffing at every station during opening hours
InterCity East Coast: Our plans
Free wifi on all trains.
Plug sockets on all trains.
New tilting electric and bi-mode diesel-electric 12 carriage Alstom Pendolino trains replacing the InterCity 125 diesel high-speed trains and the Class 91 hauled Mk4 carriages.
Additonal services across the network
Resignalling between London Kings Cross and Edinburgh
A new 'Flying Scotsman' brand of services between London and Edinburgh, running every hour calling at York and Newcastle and taking 3 hours and 45 minutes
Increased line speeds of up to 140 mph between London Kings Cross and Edinburgh
All Newcastle trains extended to Edinburgh
New hourly services to Scarborough, Cleethorpes and Lincoln.
The premium for travelling at peak-times scrapped, with just one band of ticket available, charged at current super off peak rates.
Refurbished and improved stations, eg staffing at every station during opening hours
InterCity West Coast: Our Plans
Free wifi on all trains
Plug sockets on all trains
Additonal electric and bi-mode diesel-electric 12 carriage Alstom Pendolino trains replacing the Class 221 Super Voyager's and providing more services.
Additonal services across the network.
Resignalling between London and Glasgow.
Increased line speeds of up to 140 mph between London Kings Cross and Edinburgh.
New hourly services to Shrewsbury, Leeds, Blackpool North and Bolton.
The premium for travelling at peak-times scrapped, with just one band of ticket available, charged at current super off peak rates.
Refurbished and improved stations, eg staffing at every station during opening hours
London Overground: Our Plans
Work with Transport for London to provide extra services.
Work with Transport for London to integrate new services into the network.
Work with Transport for London to enhance and expand the network.
Docklands Light Railway (in joint venture with Tellings Golden Miller): Our Plans
Work with Transport for London to provide extra services.
Work with Transport for London to integrate new services into the network.
Work with Transport for London to enhance and expand the network.
Thameslink, Southern, Great Northern and Gatwick Express: Our plans
Free wifi on all trains.
Plug sockets on all trains.
Toilets on all trains.
New Bombardier Electrostar trains replacing the class 171, 313, 317, 319 321, 365, 442 and 455 trains.
Additonal services across the network.
Resignalling between London Victoria/Bridge and Brighton.
A new 'Metro' brand of services, frequencies of every at least every ten minute between London, Sutton and Epsom via West Croydon or Hackbridge.
Remodelling of Windmill Bridge junction.
New stations at Ampthill, Cambridge Parkway and Beddington.
Automatic train operation between London Bridge and St Pancras International.
Increased line speeds of up to 100 mph between Clapham Junction/New Cross Gate and Brighton.
4 trains per hour on the Cambridge to London express service
New services between London Charing Cross and Oxford, via the North Downs Line
25KV overhead electrification between Hurst Green and Uckfield, between Ore and Ashford International, and between in unelectrified gaps on the North Downs Line.
The premium for travelling at peak-times scrapped, with just one band of ticket available, charged at current super off peak rates.
Refurbished and improved stations, eg staffing at every station during opening hours
InterCity East Coast: Our plans
Free wifi on all trains.
Plug sockets on all trains.
New tilting electric and bi-mode diesel-electric 12 carriage Alstom Pendolino trains replacing the InterCity 125 diesel high-speed trains and the Class 91 hauled Mk4 carriages.
Additonal services across the network
Resignalling between London Kings Cross and Edinburgh
A new 'Flying Scotsman' brand of services between London and Edinburgh, running every hour calling at York and Newcastle and taking 3 hours and 45 minutes
Increased line speeds of up to 140 mph between London Kings Cross and Edinburgh
All Newcastle trains extended to Edinburgh
New hourly services to Scarborough, Cleethorpes and Lincoln.
The premium for travelling at peak-times scrapped, with just one band of ticket available, charged at current super off peak rates.
Refurbished and improved stations, eg staffing at every station during opening hours
InterCity West Coast: Our Plans
Free wifi on all trains
Plug sockets on all trains
Additonal electric and bi-mode diesel-electric 12 carriage Alstom Pendolino trains replacing the Class 221 Super Voyager's and providing more services.
Additonal services across the network.
Resignalling between London and Glasgow.
Increased line speeds of up to 140 mph between London Kings Cross and Edinburgh.
New hourly services to Shrewsbury, Leeds, Blackpool North and Bolton.
The premium for travelling at peak-times scrapped, with just one band of ticket available, charged at current super off peak rates.
Refurbished and improved stations, eg staffing at every station during opening hours
London Overground: Our Plans
Work with Transport for London to provide extra services.
Work with Transport for London to integrate new services into the network.
Work with Transport for London to enhance and expand the network.
Docklands Light Railway (in joint venture with Tellings Golden Miller): Our Plans
Work with Transport for London to provide extra services.
Work with Transport for London to integrate new services into the network.
Work with Transport for London to enhance and expand the network.
Friday, 21 November 2014
Rail franchise shortlist
Thameslink, Southern, Great Northern and Gatwick Express franchise (currently First Capital Connect and Govia Southern)
Connex Thameslink
Capital Thameslink
Hope Thameslink
Intercity East Coast franchise (currently Directly Operated Railways East Coast)
Connex East Coast
Capital East Coast
Travel with Hunny East Coast
Intercity West Coast franchise (currently Virgin West Coast)
Virgin West Coast
Capital West Coast
Connex West Coast
Connex Thameslink
Capital Thameslink
Hope Thameslink
Intercity East Coast franchise (currently Directly Operated Railways East Coast)
Connex East Coast
Capital East Coast
Travel with Hunny East Coast
Intercity West Coast franchise (currently Virgin West Coast)
Virgin West Coast
Capital West Coast
Connex West Coast
New TfL tenders
Tranche 23
Route 3
Connex
Connex
22
25
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 152
Connex
Connex
13
16
New battery hybrid double deckers
New contract will see the route extended to Kingston
New contract begins on the 29th of August 2015
Route 157
Connex
Connex
17
19
Existing battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 196
Hope Buses
Connex
14
15
New and existing battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 315
Hope Buses
Connex
4
5
New flywheel hybrid single deckers
New contract begins on the 29th of August 2015
Tranche 24
Route 49
London United
Connex
20
22
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 156
Connex
Connex
16
18
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 211
Connex
Connex
19
22
New and existing hybrid double deckers
New contract begins on the 29th of August 2015
Tranche 25
Route 50
Arriva London
Connex
14
15
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 60
Capital Citybus
Capital Citybus
15
18
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 64
Capital Citybus
Capital Citybus
14
15
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 119
Capital Citybus
Capital Citybus
16
18
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 127
Capital Citybus
Connex
10
12
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 166
SurreyBus
SurreyBus
8
10
New flywheel hybrid single deckers
New contract begins on the 29th of August 2015
Route 194
Capital Citybus
Capital Citybus
14
16
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 197
Capital Citybus
London Central
14
16
New flywheel hybrid single deckers
New contract begins on the 29th of August 2015
Route 289
Arriva London
Capital Citybus
10
14
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 293
SurreyBus
SurreyBus
6
8
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 312
Capital Citybus
Connex
6
8
New flywheel hybrid single deckers
New contract will see the route extended to Lower Sydenham
New contract begins on the 29th of August 2015
Route 403
Capital Citybus
CountyBus
7
8
New battery hybrid double deckers
New contract will see the route extended to Westerham
New contract begins on the 29th of August 2015
Route 405
Capital Citybus
CountyBus
9
11
New battery hybrid double deckers
New contract will see the route extended to Reigate
New contract begins on the 29th of August 2015
Route 407
Connex
CountyBus
13
16
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 410
Arriva London
Connex
19
22
New flywheel hybrid single deckers
New contract begins on the 29th of August 2015
Route 412
Capital Citybus
Tellings Golden Miller
8
10
New flywheel hybrid double deckers
New contract begins on the 29th of August 2015
Route 434
Capital Citybus
CountyBus
3
6
New flywheel hybrid single deckers
New contract will see the route extended to Reigate, via Caterham, Merstham and Redhill
New contract begins on the 29th of August 2015
Route 455
Connex
Connex
10
12
New flywheel hybrid single deckers
New contract begins on the 29th of August 2015
Route 463
Quality Line
Capital Citybus
8
10
New flywheel hybrid single deckers
New contract begins on the 29th of August 2015
Route 466
Capital Citybus
CountyBus
17
19
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Tranche 26
Route 627
Capital Citybus
Tellings Golden Miller
2
2
New flywheel hybrid double deckers
New contract begins on the 29th of August 2015
Route 663
Arriva London
Tellings Golden Miller
1
2
New flywheel hybrid double deckers
New contract begins on the 29th of August 2015
Route 689
Arriva London
Tellings Golden Miller
1
2
New flywheel hybrid double deckers
New contract begins on the 29th of August 2015
Route S1
Quality Line
Tellings Golden Miller
11
12
New flywheel hybrid single deckers
New contract begins on the 29th of August 2015
Route S3
Quality Line
Tellings Golden Miller
8
10
New flywheel hybrid single deckers
New contract will see the route extended to Tolworth
New contract begins on the 29th of August 2015
Route S4
Quality Line
Tellings Golden Miller
6
8
New flywheel hybrid single deckers
New contract begins on the 29th of August 2015
Route 3
Connex
Connex
22
25
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 152
Connex
Connex
13
16
New battery hybrid double deckers
New contract will see the route extended to Kingston
New contract begins on the 29th of August 2015
Route 157
Connex
Connex
17
19
Existing battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 196
Hope Buses
Connex
14
15
New and existing battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 315
Hope Buses
Connex
4
5
New flywheel hybrid single deckers
New contract begins on the 29th of August 2015
Tranche 24
Route 49
London United
Connex
20
22
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 156
Connex
Connex
16
18
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 211
Connex
Connex
19
22
New and existing hybrid double deckers
New contract begins on the 29th of August 2015
Tranche 25
Route 50
Arriva London
Connex
14
15
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 60
Capital Citybus
Capital Citybus
15
18
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 64
Capital Citybus
Capital Citybus
14
15
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 119
Capital Citybus
Capital Citybus
16
18
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 127
Capital Citybus
Connex
10
12
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 166
SurreyBus
SurreyBus
8
10
New flywheel hybrid single deckers
New contract begins on the 29th of August 2015
Route 194
Capital Citybus
Capital Citybus
14
16
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 197
Capital Citybus
London Central
14
16
New flywheel hybrid single deckers
New contract begins on the 29th of August 2015
Route 289
Arriva London
Capital Citybus
10
14
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 293
SurreyBus
SurreyBus
6
8
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 312
Capital Citybus
Connex
6
8
New flywheel hybrid single deckers
New contract will see the route extended to Lower Sydenham
New contract begins on the 29th of August 2015
Route 403
Capital Citybus
CountyBus
7
8
New battery hybrid double deckers
New contract will see the route extended to Westerham
New contract begins on the 29th of August 2015
Route 405
Capital Citybus
CountyBus
9
11
New battery hybrid double deckers
New contract will see the route extended to Reigate
New contract begins on the 29th of August 2015
Route 407
Connex
CountyBus
13
16
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 410
Arriva London
Connex
19
22
New flywheel hybrid single deckers
New contract begins on the 29th of August 2015
Route 412
Capital Citybus
Tellings Golden Miller
8
10
New flywheel hybrid double deckers
New contract begins on the 29th of August 2015
Route 434
Capital Citybus
CountyBus
3
6
New flywheel hybrid single deckers
New contract will see the route extended to Reigate, via Caterham, Merstham and Redhill
New contract begins on the 29th of August 2015
Route 455
Connex
Connex
10
12
New flywheel hybrid single deckers
New contract begins on the 29th of August 2015
Route 463
Quality Line
Capital Citybus
8
10
New flywheel hybrid single deckers
New contract begins on the 29th of August 2015
Route 466
Capital Citybus
CountyBus
17
19
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Tranche 26
Route 627
Capital Citybus
Tellings Golden Miller
2
2
New flywheel hybrid double deckers
New contract begins on the 29th of August 2015
Route 663
Arriva London
Tellings Golden Miller
1
2
New flywheel hybrid double deckers
New contract begins on the 29th of August 2015
Route 689
Arriva London
Tellings Golden Miller
1
2
New flywheel hybrid double deckers
New contract begins on the 29th of August 2015
Route S1
Quality Line
Tellings Golden Miller
11
12
New flywheel hybrid single deckers
New contract begins on the 29th of August 2015
Route S3
Quality Line
Tellings Golden Miller
8
10
New flywheel hybrid single deckers
New contract will see the route extended to Tolworth
New contract begins on the 29th of August 2015
Route S4
Quality Line
Tellings Golden Miller
6
8
New flywheel hybrid single deckers
New contract begins on the 29th of August 2015
Friday, 14 November 2014
New TfL tenders
Tranche 16
Route 25
Capital Citybus
Capital Citybus
59
80
New battery hybrid double deckers
New contract begins on the 27th of September 2015
Route 26
Capital Citybus
Capital Citybus
17
20
New battery hybrid double deckers
New contract begins on the 27th of September 2015
Route 30
Capital Citybus
Capital Citybus
23
26
New battery hybrid double deckers
New contract begins on the 27th of September 2015
Tranche 17
Route 82
Hope Buses
Hope Buses
24
27
New battery hybrid double deckers
New contract begins on the 27th of September 2015
Route 141
Arriva London
Capital Citybus
25
29
New battery hybrid double deckers
New contract begins on the 27th of September 2015
Route 149
Arriva London
Capital Citybus
36
45
New battery hybrid double deckers
New contract begins on the 27th of September 2015
Tranche 18
Route 298
Sullivan Buses
Hope Buses
5
6
New diesel single deckers
New contract begins on the 3rd of October 2015
Route 306 (currently Sullivan Buses commercial 306 and 398)
*
Capital Citybus
*
8
New diesel single deckers
New route between Borehamwood and Potters Bar via Bushey, Borehamwood and South Mimms.
New contract begins on the 3rd of October 2015
Route 313
Arriva London
Hope Buses
7
9
New diesel single deckers
New contract begins on the 3rd of October 2015
Tranche 19
Route 114
London Sovereign
Capital Citybus
17
21
New battery hybrid double deckers
New contract begins on the 3rd of October 2015
Route 140
Metroline
Hope Buses
28
35
New battery hybrid double deckers
New contract begins on the 3rd of October 2015
Route 142
Arriva the Shires
Capital Citybus
15
17
New battery hybrid double deckers
New contract begins on the 3rd of October 2015
Route 258
Arriva the Shires
Capital Citybus
11
13
New battery hybrid double deckers
New contract begins on the 3rd of October 2015
Route 268
Arriva the Shires
Capital Citybus
7
8
New flywheel hybrid single deckers
New contract begins on the 3rd of October 2015
Route 303
Arriva the Shires
Capital Citybus
6
8
New flywheel hybrid single deckers
New contract begins on the 3rd of October 2015
Route 305
Arriva the Shires
Capital Citybus
4
5
New flywheel hybrid single deckers
New contract begins on the 3rd of October 2015
Tranche 20
Route 631
Arriva the Shires
Capital Citybus
2
2
New diesel single deckers
New contract begins on the 10th of October 2015
Route H2
Arriva the Shires
Capital Citybus
3
3
New diesel single deckers
New contract begins on the 10th of October 2015
Route H3
Arriva the Shires
Capital Citybus
1
1
New diesel single deckers
New contract begins on the 10th of October 2015
Route H9
London Sovereign
Capital Citybus
8
10
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route H10
London Sovereign
Capital Citybus
7
8
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route H11
London Sovereign
Capital Citybus
6
7
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route H12
Metroline
Capital Citybus
12
14
New battery hybrid double deckers
New contract begins on the 10th of October 2015
Route H13
London Sovereign
Capital Citybus
5
6
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route H14
London Sovereign
Capital Citybus
7
8
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route H17
London Sovereign
Capital Citybus
7
8
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route H18 and H19
Arriva the Shires
Capital Citybus
7
8
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Tranche 21
Route W3
Arriva London
Capital Citybus
21
26
New battery hybrid double deckers
New contract begins on the 10th of October 2015
Route W4
Capital Citybus
Capital Citybus
12
15
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W5
CT Plus
Capital Citybus
7
8
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W6
Arriva London
Capital Citybus
8
10
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W7
Metroline
Capital Citybus
17
19
New battery hybrid double deckers
New contract begins on the 10th of October 2015
Route W8
Hope Buses
Capital Citybus
14
15
New battery hybrid double deckers
New contract begins on the 10th of October 2015
Route W9
Hope Buses
Capital Citybus
8
10
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W10
Capital Citybus
Capital Citybus
1
2
New diesel single deckers
New contract begins on the 10th of October 2015
Route W11
Arriva London
Capital Citybus
7
8
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W12
CT Plus
Capital Citybus
6
7
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W13
CT Plus
Capital Citybus
5
6
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W14
Capital Citybus
Capital Citybus
10
11
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W15
Capital Citybus
Capital Citybus
22
27
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W16
Capital Citybus
Capital Citybus
8
10
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W19
Blue Triangle
Capital Citybus
11
12
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Tranche 22
Route X26
Quality Line
Capital Citybus
9
10
New battery hybrid double deckers
New contract begins on the 17th of October 2015
Route 25
Capital Citybus
Capital Citybus
59
80
New battery hybrid double deckers
New contract begins on the 27th of September 2015
Route 26
Capital Citybus
Capital Citybus
17
20
New battery hybrid double deckers
New contract begins on the 27th of September 2015
Route 30
Capital Citybus
Capital Citybus
23
26
New battery hybrid double deckers
New contract begins on the 27th of September 2015
Tranche 17
Route 82
Hope Buses
Hope Buses
24
27
New battery hybrid double deckers
New contract begins on the 27th of September 2015
Route 141
Arriva London
Capital Citybus
25
29
New battery hybrid double deckers
New contract begins on the 27th of September 2015
Route 149
Arriva London
Capital Citybus
36
45
New battery hybrid double deckers
New contract begins on the 27th of September 2015
Tranche 18
Route 298
Sullivan Buses
Hope Buses
5
6
New diesel single deckers
New contract begins on the 3rd of October 2015
Route 306 (currently Sullivan Buses commercial 306 and 398)
*
Capital Citybus
*
8
New diesel single deckers
New route between Borehamwood and Potters Bar via Bushey, Borehamwood and South Mimms.
New contract begins on the 3rd of October 2015
Route 313
Arriva London
Hope Buses
7
9
New diesel single deckers
New contract begins on the 3rd of October 2015
Tranche 19
Route 114
London Sovereign
Capital Citybus
17
21
New battery hybrid double deckers
New contract begins on the 3rd of October 2015
Route 140
Metroline
Hope Buses
28
35
New battery hybrid double deckers
New contract begins on the 3rd of October 2015
Route 142
Arriva the Shires
Capital Citybus
15
17
New battery hybrid double deckers
New contract begins on the 3rd of October 2015
Route 258
Arriva the Shires
Capital Citybus
11
13
New battery hybrid double deckers
New contract begins on the 3rd of October 2015
Route 268
Arriva the Shires
Capital Citybus
7
8
New flywheel hybrid single deckers
New contract begins on the 3rd of October 2015
Route 303
Arriva the Shires
Capital Citybus
6
8
New flywheel hybrid single deckers
New contract begins on the 3rd of October 2015
Route 305
Arriva the Shires
Capital Citybus
4
5
New flywheel hybrid single deckers
New contract begins on the 3rd of October 2015
Tranche 20
Route 631
Arriva the Shires
Capital Citybus
2
2
New diesel single deckers
New contract begins on the 10th of October 2015
Route H2
Arriva the Shires
Capital Citybus
3
3
New diesel single deckers
New contract begins on the 10th of October 2015
Route H3
Arriva the Shires
Capital Citybus
1
1
New diesel single deckers
New contract begins on the 10th of October 2015
Route H9
London Sovereign
Capital Citybus
8
10
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route H10
London Sovereign
Capital Citybus
7
8
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route H11
London Sovereign
Capital Citybus
6
7
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route H12
Metroline
Capital Citybus
12
14
New battery hybrid double deckers
New contract begins on the 10th of October 2015
Route H13
London Sovereign
Capital Citybus
5
6
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route H14
London Sovereign
Capital Citybus
7
8
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route H17
London Sovereign
Capital Citybus
7
8
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route H18 and H19
Arriva the Shires
Capital Citybus
7
8
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Tranche 21
Route W3
Arriva London
Capital Citybus
21
26
New battery hybrid double deckers
New contract begins on the 10th of October 2015
Route W4
Capital Citybus
Capital Citybus
12
15
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W5
CT Plus
Capital Citybus
7
8
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W6
Arriva London
Capital Citybus
8
10
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W7
Metroline
Capital Citybus
17
19
New battery hybrid double deckers
New contract begins on the 10th of October 2015
Route W8
Hope Buses
Capital Citybus
14
15
New battery hybrid double deckers
New contract begins on the 10th of October 2015
Route W9
Hope Buses
Capital Citybus
8
10
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W10
Capital Citybus
Capital Citybus
1
2
New diesel single deckers
New contract begins on the 10th of October 2015
Route W11
Arriva London
Capital Citybus
7
8
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W12
CT Plus
Capital Citybus
6
7
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W13
CT Plus
Capital Citybus
5
6
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W14
Capital Citybus
Capital Citybus
10
11
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W15
Capital Citybus
Capital Citybus
22
27
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W16
Capital Citybus
Capital Citybus
8
10
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Route W19
Blue Triangle
Capital Citybus
11
12
New flywheel hybrid single deckers
New contract begins on the 10th of October 2015
Tranche 22
Route X26
Quality Line
Capital Citybus
9
10
New battery hybrid double deckers
New contract begins on the 17th of October 2015
Monday, 10 November 2014
Capital Transport Services news update
Capital Citybus has had a bad tender round and lost 198 buses of work at our Greenford and Hayes operations. We intend to shut the Uxbridge and Greenford depots, and move work to Hayes (HY) and our new Rickmansworth (RW) depot. The work we have lost is:
Route 92
Route 207
Route 282
Route 427 (withdrawn)
Route 607
Route E1
Route E3
Route E5
Route E7
Route E9
Route E10
We however have gained these routes:
Route U7 from Hayes (HY)
Route U9 from Rickmansworth (RW)
We also have retained these routes:
Route U1
Route U2
Route U3
Route U4
Route U5
Route U6 (formerly known as route 331)
Route U8 (formerly known as route A10)
Route U10
The routes currently at Uxbridge will be subject to a restructuring:
Route U1 will be moved to Hayes (HY)
Route U2 will be moved to Hayes (HY)
Route U3 will be moved to Hayes (HY)
Route U4 will be moved to Hayes (HY)
Route U5 will be moved to Hayes (HY)
Route U6 will be moved to Rickmansworth (RW)
Route U8 will be moved to Hayes (HY)
Route U10 will be moved to Hayes (HY)
The routes currently at Greenford will be subject to a restructuring:
Route 92 will be moved to Hayes (HY) until awarded to Hope Buses in September 2015
Route 282 will be moved to Rickmansworth (RW) until awarded to Hope Buses in September 2015
Route E1 will be moved to Hayes (HY) until awarded to Hope Buses in September 2015
Route E3 will be moved to Hayes (HY) until awarded to Hope Buses in September 2015
Route E5 will be moved to Hayes (HY) until awarded to Hope Buses in September 2015
Route E7 will be moved to Rickmansworth (RW) until awarded to Hope Buses in September 2015
Route E9 will be moved to Hayes (HY) until awarded to Hope Buses in September 2015
Route E10 will be moved to Hayes (HY) until awarded to Hope Buses in September 2015
These changes will take place on the 20th of December 2014.
Route 92
Route 207
Route 282
Route 427 (withdrawn)
Route 607
Route E1
Route E3
Route E5
Route E7
Route E9
Route E10
We however have gained these routes:
Route U7 from Hayes (HY)
Route U9 from Rickmansworth (RW)
We also have retained these routes:
Route U1
Route U2
Route U3
Route U4
Route U5
Route U6 (formerly known as route 331)
Route U8 (formerly known as route A10)
Route U10
The routes currently at Uxbridge will be subject to a restructuring:
Route U1 will be moved to Hayes (HY)
Route U2 will be moved to Hayes (HY)
Route U3 will be moved to Hayes (HY)
Route U4 will be moved to Hayes (HY)
Route U5 will be moved to Hayes (HY)
Route U6 will be moved to Rickmansworth (RW)
Route U8 will be moved to Hayes (HY)
Route U10 will be moved to Hayes (HY)
The routes currently at Greenford will be subject to a restructuring:
Route 92 will be moved to Hayes (HY) until awarded to Hope Buses in September 2015
Route 282 will be moved to Rickmansworth (RW) until awarded to Hope Buses in September 2015
Route E1 will be moved to Hayes (HY) until awarded to Hope Buses in September 2015
Route E3 will be moved to Hayes (HY) until awarded to Hope Buses in September 2015
Route E5 will be moved to Hayes (HY) until awarded to Hope Buses in September 2015
Route E7 will be moved to Rickmansworth (RW) until awarded to Hope Buses in September 2015
Route E9 will be moved to Hayes (HY) until awarded to Hope Buses in September 2015
Route E10 will be moved to Hayes (HY) until awarded to Hope Buses in September 2015
These changes will take place on the 20th of December 2014.
New TfL tenders
Tranche 13
Route 83
Metroline West
Hope Buses
28
35
New battery hybrid double deckers
New contract begins on the 13th of September 2015
Route 92
Capital Citybus
Hope Buses
18
22
New battery hybrid double deckers
New contract begins on the 13th of September 2015
Route 207
Capital Citybus
Hope Buses
35
53
New battery hybrid double deckers
New contract will see the route extended to Uxbridge via route 427, which will be withdrawn
New contract begins on the 13th of September 2015
Route 282
Capital Citybus
Hope Buses
16
19
New battery hybrid double deckers
New contract begins on the 13th of September 2015
Route 297
Hope Buses
Hope Buses
16
18
New battery hybrid double deckers
New contract begins on the 13th of September 2015
Route 607
Capital Citybus
Hope Buses
20
30
New battery hybrid double deckers
New contract begins on the 13th of September 2015
Tranche 14
Route E1
Capital Citybus
Hope Buses
7
13
New flywheel hybrid double deckers
New contract will see the route extended to White City via Acton.
New contract begins on the 20th of September 2015
Route E2
Metroline
Hope Buses
15
18
New flywheel hybrid double deckers
New contract begins on the 20th of September 2015
Route E3
Capital Citybus
Hope Buses
26
32
New flywheel hybrid double deckers
New contract begins on the 20th of September 2015
Route E5
Capital Citybus
Hope Buses
11
13
New and existing diesel single deckers
New contract begins on the 20th of September 2015
Route E6
Hope Buses
Hope Buses
12
14
Existing diesel single deckers
New contract begins on the 20th of September 2015
Route E7
Capital Citybus
Hope Buses
10
12
Existing diesel single deckers
New contract begins on the 20th of September 2015
Route E8
Metroline
Hope Buses
11
14
New flywheel hybrid double deckers
New contract will see the route extended to Hounslow via Isleworth
New contract begins on the 20th of September 2015
Route E9
Capital Citybus
Hope Buses
8
10
Existing diesel single deckers
New contract begins on the 20th of September 2015
Route E10
Capital Citybus
Hope Buses
7
14
New and existing diesel single deckers
New contract will see the route extended to Chiswick Business Park via Ealing Common and Gunnersbury
New contract begins on the 20th of September 2015
Route E11
London United
Hope Buses
5
7
New and existing diesel single deckers
New contract begins on the 20th of September 2015
Tranche 15
Route U1
Capital Citybus
Capital Citybus
8
9
New flywheel hybrid single deckers
New contract begins on the 27th of September 2015
Route U2
Capital Citybus
Capital Citybus
8
10
New flywheel hybrid single deckers
New contract begins on the 27th of September 2015
Route U3
Capital Citybus
Capital Citybus
11
13
New battery hybrid double deckers
New contract begins on the 27th of September 2015
Route U4
Capital Citybus
Capital Citybus
14
16
New battery hybrid double deckers
New contract begins on the 27th of September 2015
Route U5
Capital Citybus
Capital Citybus
11
13
New flywheel hybrid single deckers
New contract begins on the 27th of September 2015
Route U6 (formerly 331)
Capital Citybus
Capital Citybus
7
9
New flywheel hybrid single deckers
New contract begins on the 27th of September 2015
Route U7
Abellio London
Capital Citybus
4
5
New flywheel hybrid single deckers
New contract begins on the 27th of September 2015
Route U8 (formerly A10)
Capital Citybus
Capital Citybus
5
7
New flywheel hybrid single deckers
New contract begins on the 27th of September 2015
Route U9
Abellio London
Capital Citybus
3
5
New flywheel hybrid single deckers
New contract will see the route extended to Rickmansworth via Moor Park
New contract begins on the 27th of September 2015
Route U10
Capital Citybus
Capital Citybus
2
4
New flywheel hybrid single deckers
New contract will see the route have a Sunday service introduced
New contract begins on the 27th of September 2015
Route 83
Metroline West
Hope Buses
28
35
New battery hybrid double deckers
New contract begins on the 13th of September 2015
Route 92
Capital Citybus
Hope Buses
18
22
New battery hybrid double deckers
New contract begins on the 13th of September 2015
Route 207
Capital Citybus
Hope Buses
35
53
New battery hybrid double deckers
New contract will see the route extended to Uxbridge via route 427, which will be withdrawn
New contract begins on the 13th of September 2015
Route 282
Capital Citybus
Hope Buses
16
19
New battery hybrid double deckers
New contract begins on the 13th of September 2015
Route 297
Hope Buses
Hope Buses
16
18
New battery hybrid double deckers
New contract begins on the 13th of September 2015
Route 607
Capital Citybus
Hope Buses
20
30
New battery hybrid double deckers
New contract begins on the 13th of September 2015
Tranche 14
Route E1
Capital Citybus
Hope Buses
7
13
New flywheel hybrid double deckers
New contract will see the route extended to White City via Acton.
New contract begins on the 20th of September 2015
Route E2
Metroline
Hope Buses
15
18
New flywheel hybrid double deckers
New contract begins on the 20th of September 2015
Route E3
Capital Citybus
Hope Buses
26
32
New flywheel hybrid double deckers
New contract begins on the 20th of September 2015
Route E5
Capital Citybus
Hope Buses
11
13
New and existing diesel single deckers
New contract begins on the 20th of September 2015
Route E6
Hope Buses
Hope Buses
12
14
Existing diesel single deckers
New contract begins on the 20th of September 2015
Route E7
Capital Citybus
Hope Buses
10
12
Existing diesel single deckers
New contract begins on the 20th of September 2015
Route E8
Metroline
Hope Buses
11
14
New flywheel hybrid double deckers
New contract will see the route extended to Hounslow via Isleworth
New contract begins on the 20th of September 2015
Route E9
Capital Citybus
Hope Buses
8
10
Existing diesel single deckers
New contract begins on the 20th of September 2015
Route E10
Capital Citybus
Hope Buses
7
14
New and existing diesel single deckers
New contract will see the route extended to Chiswick Business Park via Ealing Common and Gunnersbury
New contract begins on the 20th of September 2015
Route E11
London United
Hope Buses
5
7
New and existing diesel single deckers
New contract begins on the 20th of September 2015
Tranche 15
Route U1
Capital Citybus
Capital Citybus
8
9
New flywheel hybrid single deckers
New contract begins on the 27th of September 2015
Route U2
Capital Citybus
Capital Citybus
8
10
New flywheel hybrid single deckers
New contract begins on the 27th of September 2015
Route U3
Capital Citybus
Capital Citybus
11
13
New battery hybrid double deckers
New contract begins on the 27th of September 2015
Route U4
Capital Citybus
Capital Citybus
14
16
New battery hybrid double deckers
New contract begins on the 27th of September 2015
Route U5
Capital Citybus
Capital Citybus
11
13
New flywheel hybrid single deckers
New contract begins on the 27th of September 2015
Route U6 (formerly 331)
Capital Citybus
Capital Citybus
7
9
New flywheel hybrid single deckers
New contract begins on the 27th of September 2015
Route U7
Abellio London
Capital Citybus
4
5
New flywheel hybrid single deckers
New contract begins on the 27th of September 2015
Route U8 (formerly A10)
Capital Citybus
Capital Citybus
5
7
New flywheel hybrid single deckers
New contract begins on the 27th of September 2015
Route U9
Abellio London
Capital Citybus
3
5
New flywheel hybrid single deckers
New contract will see the route extended to Rickmansworth via Moor Park
New contract begins on the 27th of September 2015
Route U10
Capital Citybus
Capital Citybus
2
4
New flywheel hybrid single deckers
New contract will see the route have a Sunday service introduced
New contract begins on the 27th of September 2015
Saturday, 8 November 2014
New SCC tenders
Tranche 1
Route 23
SurreyBus
SurreyBus
2
2
New flywheel hybrid single deckers
New contract begins on the 27th of January 2015
Route 24
SurreyBus
SurreyBus
3
4
New flywheel hybrid single deckers
New contract begins on the 27th of January 2015
Route 25
SurreyBus
SurreyBus
2
2
New flywheel hybrid single deckers
New contract begins on the 27th of January 2015
Tranche 2
Route 318
SurreyBus
Hope Buses
2
3
Existing diesel single deckers
New contract begins on the 27th of January 2015
Route 516
SurreyBus
SurreyBus
2
2
New flywheel hybrid single deckers
New contract begins on the 27th of January 2015
Tranche 3
Route 441
Tellings Golden Miller
BerksBus
3
5
Existing diesel single deckers
New contract begins on the 27th of January 2015
Route 451
Abellio Surrey
BerksBus
2
3
New flywheel hybrid single deckers
New contract begins on the 27th of January 2015
Route 515 (includes 515A)
Tellings Golden Miller
SurreyBus
3
4
New flywheel hybrid single deckers
New contract begins on the 27th of January 2015
Route 555
Abellio Surrey
Hope Buses
6
7
New diesel single deckers
New contract begins on the 27th of January 2015
Route 557
Abellio Surrey
Hope Buses
4
5
New diesel single deckers
New contract begins on the 27th of January 2015
First' Berkshire operations have been bought by Capital Transport Services, operations will be branded as BerksBus. Arriva's Hemel Hempstead operation has been bought by Capital Transport Services, operations will be branded as HertsBus.
Route 23
SurreyBus
SurreyBus
2
2
New flywheel hybrid single deckers
New contract begins on the 27th of January 2015
Route 24
SurreyBus
SurreyBus
3
4
New flywheel hybrid single deckers
New contract begins on the 27th of January 2015
Route 25
SurreyBus
SurreyBus
2
2
New flywheel hybrid single deckers
New contract begins on the 27th of January 2015
Tranche 2
Route 318
SurreyBus
Hope Buses
2
3
Existing diesel single deckers
New contract begins on the 27th of January 2015
Route 516
SurreyBus
SurreyBus
2
2
New flywheel hybrid single deckers
New contract begins on the 27th of January 2015
Tranche 3
Route 441
Tellings Golden Miller
BerksBus
3
5
Existing diesel single deckers
New contract begins on the 27th of January 2015
Route 451
Abellio Surrey
BerksBus
2
3
New flywheel hybrid single deckers
New contract begins on the 27th of January 2015
Route 515 (includes 515A)
Tellings Golden Miller
SurreyBus
3
4
New flywheel hybrid single deckers
New contract begins on the 27th of January 2015
Route 555
Abellio Surrey
Hope Buses
6
7
New diesel single deckers
New contract begins on the 27th of January 2015
Route 557
Abellio Surrey
Hope Buses
4
5
New diesel single deckers
New contract begins on the 27th of January 2015
First' Berkshire operations have been bought by Capital Transport Services, operations will be branded as BerksBus. Arriva's Hemel Hempstead operation has been bought by Capital Transport Services, operations will be branded as HertsBus.
Friday, 7 November 2014
HOPE GROUP WINS SE AND SWT FRANCHISES
The Hope Group are proud to announce that we have successfully won the contract to operate the South Western and Integrated Kent franchises, currently being run by Stagecoach and Go Ahead -Keolis respectably
We are going to spending approximately £1 billion on rolling stock with a further £80 million on infrastructure and service improvements, such as a flyover near Woking to ease congestion in the area, and enhancing the facilities involved on our trains.
Other improvements include:
More trains per hour on SWT Suburban services
Electrification of the Exeter line
Extra semi-fast peak services
More trains running on HS1 during the busiest times
More trains in the evening on Gravesend lines during the peak Christmas shopping period
New class 386, 5-car units built by Bombardier and similar to class 376 running on SET.
We hope that we'll enhance the standard of service provided by these operations, and we hope that you have a good journey.
We are going to spending approximately £1 billion on rolling stock with a further £80 million on infrastructure and service improvements, such as a flyover near Woking to ease congestion in the area, and enhancing the facilities involved on our trains.
Other improvements include:
More trains per hour on SWT Suburban services
Electrification of the Exeter line
Extra semi-fast peak services
More trains running on HS1 during the busiest times
More trains in the evening on Gravesend lines during the peak Christmas shopping period
New class 386, 5-car units built by Bombardier and similar to class 376 running on SET.
We hope that we'll enhance the standard of service provided by these operations, and we hope that you have a good journey.
Tellings Golden Miller
Tellings Golden Miller
Fred Varney founded the Golden Miller company with the winnings from a bet made on the horse Golden Miller, which won the Cheltenham Gold Cup and the Grand National in 1934. In June 1985 Wilder sold Golden Miller to Tellings Coaches of Byfleet, a family-run concern which had been founded by Stephen Telling in 1972. In June 2005, Tellings Golden Miller had had enough and sold their operations to National Express (Travel London) then in 2009 to Abellio.
Now, in the fictional world of buses, I have decided to reproduce TGM and run quality bus services as they did 15 years ago.
New TfL tenders
Tranche 8
Route 80
Hope Buses
Hope Buses
10
12
New battery hybrid double deckers
New contract includes extension to Burgh Heath Asda via Banstead
New contract begins on the 29th of August 2015
Route 93
Hope Buses
Hope Buses
21
23
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 151
Hope Buses
Hope Buses
13
14
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 154
Hope Buses
Hope Buses
12
14
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 163
London General
Hope Buses
12
13
New diesel single deckers
New contracts begins on the 29th of August 2015
Route 164
London General
Hope Buses
12
13
New diesel single deckers
New contract begins on the 29th of August 2015
Route 213
Hope Buses
Hope Buses
19
21
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Tranche 9
Route 218
*
Tellings Golden Miller
*
6
New flywheel hybrid single deckers
Route 80
Hope Buses
Hope Buses
10
12
New battery hybrid double deckers
New contract includes extension to Burgh Heath Asda via Banstead
New contract begins on the 29th of August 2015
Route 93
Hope Buses
Hope Buses
21
23
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 151
Hope Buses
Hope Buses
13
14
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 154
Hope Buses
Hope Buses
12
14
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Route 163
London General
Hope Buses
12
13
New diesel single deckers
New contracts begins on the 29th of August 2015
Route 164
London General
Hope Buses
12
13
New diesel single deckers
New contract begins on the 29th of August 2015
Route 213
Hope Buses
Hope Buses
19
21
New battery hybrid double deckers
New contract begins on the 29th of August 2015
Tranche 9
Route 218
*
Tellings Golden Miller
*
6
New flywheel hybrid single deckers
New route between Kingston and Walton on Thames via Surbiton, Esher and Hersham
New contract begins on the 6th of September 2015
Route 411
Quality Line
Tellings Golden Miller
New contract begins on the 6th of September 2015
Route 411
Quality Line
Tellings Golden Miller
6
8
New flywheel hybrid single deckers
New contract begins on the 6th of September 2015
Route 641
Quality Line
Tellings Golden Miller
1
2
New flywheel hybrid single deckers
New contract begins on the 6th of September 2015
Tranche 10
Route 111
Hope Buses
Hope Buses
23
26
New battery hybrid double deckers
New contract begins on the 22nd of August 2015
Route 285
Hope Buses
Hope Buses
19
24
New battery hybrid double deckers
New contract begins on the 22nd of August 2015
Tranche 11
Route 71
Hope Buses
Hope Buses
12
13
New battery hybrid double deckers
New contract begins on the 15th of August 2015
Route 131
Hope Buses
Hope Buses
20
22
New battery hybrid double deckers
New contract begins on the 15th of August 2015
Tranche 12
Route 118
Hope Buses
Hope Buses
12
13
New battery hybrid double deckers
New contract begins on the 8th of August 2015
Tranche 13
Route 465
Quality Line
SurreyBus
5
8
New flywheel hybrid single deckers
New contract includes a extension to Fulwell, Bus Garage via Teddington.
New contract begins on the 6th of September 2015
Route 467
Quality Line
SurreyBus
2
9
New battery hybrid double deckers
New contract includes a extension to Richmond, Manor Circus via the 465 and 371 route.
New contract begins on the 6th of September 2015
Route 470
Quality Line
Tellings Golden Miller
7
9
New flywheel hybrid single deckers
New contract will see the route extended to Tooting, St George's Hospital and to Leatherhead via Ashstead.
New contract begins on the 6th of September 2015.
Route K1
Abellio London
Tellings Golden Miller
9
13
New flywheel hybrid single deckers
New contract will see the route extended to Wimbledon, via Raynes Park.
New contract begins on the 6th of September 2015.
Route K2
London United
Tellings Golden Miller
10
11
New flywheel hybrid single deckers
New contract will see the route extended to Roehampton Vale
New contract begins on the 6th of September 2015.
Route K3
Abellio London
Tellings Golden Miller
11
14
New flywheel hybrid single deckers
New contract will see the route extended to Wandsworth, via Roehampton and Putney.
New contract begins on the 6th of September 2015.
Route K4
London United
Tellings Golden Miller
4
6
New flywheel hybrid single deckers
New contract will see the route extended to North Cheam, Sainsbury's and a Sunday service introduced.
New contract begins on the 6th of September 2015.
Route K5
Quality Line
Tellings Golden Miller
3
5
New flywheel hybrid single deckers
New contract includes a Sunday service, and a extension to Colliers Wood.
New contract begins on the 6th of September 2015.
Thursday, 6 November 2014
Capital Citybus and Transport Services news update
This is a news update for Capital Transport Services. Due to future wins, a restructuring process will take place on Saturday the 8th of November 2014.
Route 26 will transfer from Lea Interchange (LI) to the new Old Kent Road (SK) depot
Route 48 will transfer from Leyton (LT) to the new Old Kent Road (SK) depot
Route 56 will transfer from Leyton (LT) to Lea Interchange (LI) depot
Route 166 will transfer from South Croydon (SC) to SurreyBus' Epsom (ES) depot
Route 197 will transfer from South Croydon (SC) to the new Old Kent Road (SK) depot
Route RV1 will transfer from Lea Interchange (LI) to the new Old Kent Road (SK) depot
SurreyBus has also won routes 465 and 467. Contracts begin on the 6th of September 2015.
Route 26 will transfer from Lea Interchange (LI) to the new Old Kent Road (SK) depot
Route 48 will transfer from Leyton (LT) to the new Old Kent Road (SK) depot
Route 56 will transfer from Leyton (LT) to Lea Interchange (LI) depot
Route 166 will transfer from South Croydon (SC) to SurreyBus' Epsom (ES) depot
Route 197 will transfer from South Croydon (SC) to the new Old Kent Road (SK) depot
Route RV1 will transfer from Lea Interchange (LI) to the new Old Kent Road (SK) depot
SurreyBus has also won routes 465 and 467. Contracts begin on the 6th of September 2015.
Wednesday, 5 November 2014
Rail franchise shortlist
SShortlisted bidders for some rail franchises have been announced.
Integregated Kent Franchise (current Govia Southeastern)
Abellio SouthEastern
Hope SouthEastern
Capital South Eastern
South Western franchise (currently Stagecoach South West Trains)
Hope SouthWestern
Capital SouthWestern
Abellio SouthWestern
Govia SouthWestern
Stagecoach SouthWestern
Travel with Honey SouthWestern
Docklands Light Railway concession (currently Serco DLR)
Docklands Rail Services (a joint venture between Tellings Golden Miller and Capital Transport Services)
Abellio DLR
London Overground Concession (currently Arriva and MTR London Overground)
Tellings Golden Miller London Overground
Capital London Overground
Arriva London Overground
Tuesday, 4 November 2014
New TfL tenders
Tranche 5
Route 57
London United
Hope Buses
26
32
New flywheel hybrid double deckers
New contract begins on the 1st of August 2015
Route 65
London United
Hope Buses
22
25
New flywheel hybrid double deckers
New contract begins on the 1st of August 2015
Route 112
Abellio London
Tellings Golden Miller
7
22
New flywheel hybrid double deckers
New contract will see the route extended to Turnpike Lane Station, via route 232 which will be withdrawn.
New contract will see the route extended to Turnpike Lane Station, via route 232 which will be withdrawn.
New contract begins on the 1st of August 2015
Route 203
Hope Buses
Hope Buses
6
7
New diesel single deckers
New contract begins on the 1st of August 2015
Route 281
London United
Tellings Golden Miller
23
24
Existing flywheel hybrid double deckers
New contract begins on the 1st of August 2015
Tranche 6
Route 485
London General
Hope Buses
3
4
New diesel single deckers
New contract begins on the 8th of August 2015
Route 493
London General
Hope Buses
17
20
New diesel single deckers
New contract begins on the 8th of August 2015
Tranche 7
Route H20
Abellio London
Hope Buses
5
6
New diesel single deckers
New contract begins on the 15th of August 2015
Route H22
London United
Hope Buses
11
13
New flywheel hybrid double deckers
New contract begins on the 15th of August 2015.
Route H25
Abellio London
Abellio London
7
8
New flywheel hybrid single deckers
New contract begins on the 15th of August 2015.
Route H26
Abellio London
Bear Buses
4
5
New diesel single deckers
New contract begins on the 15th of August 2015.
Route H28
Abellio London
Tellings Golden Miller
8
9
New flywheel hybrid single deckers
New contract begins on the 15th of August 2015.
Route H32
Hope Buses
Hope Buses
12
14
New flywheel hybrid double deckers
New contract begins on the 15th of August 2015.
Route H37
Hope Buses
Hope Buses
15
19
New diesel single deckers
New contract begins on the 15th of August 2015.
Route H91
London United
Hope Buses
14
17
New flywheel hybrid double deckers
New contract begins on the 15th of August 2015.
Route H98
Hope Buses
Hope Buses
15
17
New flywheel hybrid double deckers
New contract begins on the 15th of August 2015.
Monday, 3 November 2014
New TfL tenders
This the latest TfL tender results
Tranche 1
Route 68
London Central
Capital Citybus
21
22
New battery hybrid double deckers
New contract begins on the 18th of July 2015.
Route 109
Arriva London
Tellings Golden Miller
25
31
New flywheel hybrid double deckers
New contract begins on the 18th of July 2015.
Route 250
Arriva London
Capital Citybus
23
26
New battery hybrid double deckers
New contract begins on the 18th of July 2015.
Route 468
London Central
Capital Citybus
26
32
New battery hybrid double deckers
New contract begins on the 18th of July 2015.
Route N68
London Central
Capital Citybus
6
9
New battery hybrid double deckers
New contract includes extension from Old Coulsdon to Caterham.
New contract begins on the 18th of July 2015.
Route N109
Arriva London
Tellings Golden Miller
9
11
New flywheel hybrid double deckers.
New contract begins on the 18th of July 2015.
Route X68
London Central
Capital Citybus
7
13
New battery hybrid double deckers.
New contract will see route run 7 days a week, 06:00 to 23:00, every 15 mins.
New contract begins on the 18th of July 2015.
Tranche 2
Route C1
London United
Hope Buses
14
17
New flywheel hybrid double deckers.
New contract begins on the 4th of July 2015.
Route C2
Abellio London
Capital Citybus
19
22
New battery hybrid double deckers.
New contract includes extension from Parliment Hill Fields to Finsbury Park Station via Highgate, Archway and Holloway.
New contract begins on the 4th of July 2015.
Route C3
Abellio London
Hope Buses
12
14
New battery hybrid double deckers.
New contract begins on the 4th of July 2015.
Route C4
*
Hope Buses
*
13
New flywheel hybrid double deckers.
New route between Fulham Broadway and Crystal Palace via Clapham Junction and Streatham.
New contract begins on the 11th of July 2015.
Route C5
*
Hope Buses
*
15
New flywheel hybrid double deckers.
New route between Fulham Broadway and Kingston via Putney, Richmond and Ham.
New contract begins on the 11th of July 2015.
Route C10
Abellio London
Capital Citybus
14
20
New flywheel hybrid single deckers
New contract begins on the 11th of July 2015.
Tranche 3
Route 392
*
Capital Citybus
*
5
New flywheel hybrid single deckers.
New route between Brixton and Bromley North via Dulwich, Crystal Palace, Elmers End and Beckenham.
New contract begins on the 27th of June 2015.
Route G1
London General
Capital Citybus
9
14
New flywheel hybrid single deckers.
New contract begins on the 27th of June 2015.
Tranche 4
Route P4
Stagecoach London
Capital Citybus
11
14
New battery hybrid double deckers.
New contract begins on the 18th of July 2015.
Route P5
London Central
Tellings Golden Miller
8
10
New flywheel hybrid single deckers.
New contract begins on the 18th of July 2015.
Route P12
London Central
Capital Citybus
12
15
New flywheel hybrid single deckers.
New contract begins on the 27th of June 2015.
Route P13
Abellio London
Capital Citybus
8
10
New flywheel hybrid single deckers
New contract begins on the 27th of June 2015.
Next tenders will be between 10th and 14th of November.
Welcome!
Welcome to the Transport Operations Game, a new fictional blog for running transport services, with a focus on TfL bus tendering. Rail franchising will also be included. This blog will be formed of Tom (me), running Capital Transport Services with bus ops in London as Capital Citybus, in Surrey as SurreyBus, and in Essex and Hertfordshire as EssexBus Omid running Hope Buses, with bus ops across the capital, and Thomas running Tellings-Golden Miller. We hope you enjoy this new blog
Subscribe to:
Posts (Atom)




